Open well conversion in Kibaoni

An open well conversion in Kibaoni for Mr Likopa and his family. Little speciality: we have put a piece of 6’’ pipe on top, which leaves space for the owner to later add an electric pump to this installation. Also we put the usual 3/4’’ raising main and a 1’’ pipe to secure the rope all the way down + make sure it will not get tangled with the electric pump. This pipe has many small holes which reduce the effort and allow water to better circulate in and out of the pipe.